Choosing a commercial DC charger: 60, 120 or 180 kW
The Eruixinyun PDL-III range includes 60, 120 and 180 kW DC charging stations in several cabinet formats. These ratings provide a starting point for equipment selection. The useful comparison is how each option fits the vehicles, parking time and electrical capacity at your site.
When to compare the 60 kW range
Include 60 kW in your shortlist when vehicles have time to remain parked and the available site supply makes this class worth evaluating. Examples to discuss include retail parking, a dealership or managed public parking. These examples describe potential uses, not completed Eruixinyun installations.
Review the vehicle charging limits and expected energy per visit. A lower-rated unit may fit some sessions, while a busy site may need more outlets or a different arrangement. A site assessment is necessary before choosing either more units or a larger unit.
When to compare 120 and 180 kW
Review the 120 and 180 kW options when shorter parking windows or repeated arrivals make a higher DC output relevant. Send the vehicle list and expected arrival pattern rather than selecting a rating only because it is larger. A vehicle that cannot accept the available output will not use the charger's full rating.
Actual charging power changes with the vehicle, battery conditions and selected equipment configuration. Where a cabinet has more than one outlet, confirm simultaneous charging and power sharing. Do not assume the cabinet's total rating is available independently at every connector.
Cabinet A, B, C or D?
Products with the same power rating have separate pages because their cabinet layouts and documented configurations differ. Compare the actual specification table on each page, including input voltage, operating conditions, screen, connectivity and backend protocol. A shared power rating does not mean every other feature is identical.
The catalogue lists CCS or GB/T quotation options for these DC products. Sales must confirm the exact connector standard for the vehicles you expect to serve. Operator software, access control and payment functions also need confirmation for the selected unit; an OCPP reference alone does not establish that a particular integration has been tested.
Prepare a useful site brief
Tell us the country and location type, the vehicles to be charged, the planned number of charging bays and the power available to the charging system. Include the approximate equipment budget, desired delivery window and whether an operator platform has already been chosen. Identify any information still awaiting a local electrical assessment.
Equipment price and project cost
The displayed USD price is for the equipment. It does not include freight or other charges unless your sales quotation expressly includes them. Discuss site works, electrical connection, commissioning responsibilities and ongoing services separately so that quotations can be compared on the same basis.
If the site needs a smaller wall-mounted DC format, review the compact charger below. If it needs a higher-power or split system, use the high-power category and discuss the output arrangement with our team before selecting a model.